Wastewater treament plant of Saigon Tobacco Co., Ltd.
Wastewater treatment plant of Saigon Tobacco Company has a capacity of 670 m3/ day, was installed with modern equipment. Treated wastewater reaches QCVN 40: 2011/BTNMT.
Wastewater treatment plant of Saigon Tobacco Company has a capacity of 670 m3/ day, was installed with modern equipment. Its processing comprises physical, chemical and biological processes. Treated wastewater reaches QCVN 40: 2011/BTNMT and certified by HEPZA and periodic monitoring by authorities of Vinh Loc IP.
Sludge from Sedimentation and Clarifier → Thickener → Belt Press → Dried sludge collected and handled
Pictures of the WWTP of sai Gon Tabacco Co., Ltd installed by Saigon EnviGreen